NEW 26m Pump  
Our *NEW* twenty six meter concrete squeeze pump is the most simple pump to use on the market today. It can also pump cellular, aerated, and lightweight concrete mixes at one of the lowest cost per yard in the industry. MSRP $249,500. We are very excited about this new product and know that you will be to.
 
Small Line Pumps  
MAYCO pumps have been the industry standard for over 30 years No small-line ball-valve concrete trailer pump is more trusted or respected today than a MAYCO!
 
Used Boom Pumps  
Concrete Squeeze Pumps has a large array of used Concrete Boom Pumps for sale to facilitate your needs. Be sure to check out our Used Boom Pumps page to see all of the excellent deals on used boom pumps we have to offer.
  Contact Information
Concrete Squeeze Pumps, LLC
11544 Normandy Blvd.
Jacksonville, FL 32221
Toll Free: 888-279-7867
In Florida: 904-378-0007
In NJ: 609-425-6655
Fax: 904-378-8007
 

Slick-Pak (Concrete Primer and Pumping Aid)

Use
Slick-Pak is the patented polymer-based concrete pump primer. Used worldwide, it is now the standard for priming concrete pumps. This product eliminates problems associated with the use of bentonite or similar materials for pump priming. It reduces wear on equipment when starting a job.
ADVANTAGES
  • The original patented pump primer.
  • No need for expensive ready-mixed priming grout.
  • Eliminates the need for carrying bagged cement.
  • Packaged in easy to handle 8 ounce bags.
  • Increases ease and range of pumpability.
  • Decreases wear on equipment.
  • Easily introduced into pumping equipment.
  • Decreases horsepower required for pumping.
  • Reduces friction and line pressure.
  • Packaged in water-soluble Fritz-Pak inner bags.
DESCRIPTION
Slick-Pak is a dry powdered pump primer and pumping aid packaged in a patented, ready-to-use, water-soluble bag. Slick-Pak is uniquely formulated to provide the concrete pumper with a cost-effective replacement for premium priced grout, primer slurries or bagged cement primers. Additionally, Slick-Pak functions as a concrete pumping aid by reducing line pressure, which enables the placement of hard to pump mixes and increasing the range of pumpability. Slick-Pak is also environmentally safe and compatible with all conventional concrete materials. Slick-Pak contains no bentonite, cementitious materials, soaps or air entraining agents.

Slick-Pak FAQ's:
Q. How does Slick-Pak work?
A. It contains water thickeners and lubricating agents. As it goes through the pipes and hoses it leaves a coat of water and lubricating agents and effectively wets all surfaces. As concrete comes behind the Slick-Pak it does not lose water and the lubrication allows it to slip through the pipe.
Q. What is the difference between Slick-Pak and Slick-Pak II?
A. Both products have water thickeners and lubricating agents. Slick-Pak has a higher proportion of lubricating agents, thus it is better used as a pump primer. Slick-Pak II has a higher proportion of thickeners, so is better suited as a pump aid, and is also an excellent pump primer.
Q. Does Slick-Pak have fluid loss properties?
A. Yes. The thickeners used in Slick-Pak work as fluid loss additives in the concrete.
Q. If I have a long run of hose or pipe, should I increase the Slick-Pak concentration to make it more effective?
A. No. A too-high concentration may thicken the concrete excessively and produce a plug in the line. It is better to increase the volume of Slick-Pak used to insure complete coverage and wetting of the line.
Q. What is the best way to prime horizontal lines?
A. Slick-Pak will tend to run on the lower part of the line, so we recommend using a rubber ball in front of the priming solution to avoid only wetting the bottom of the line.
Q. Why do I get plugs when priming for concrete containing superplasticizers?
A. Slick-Pak requires water to hydrate. When Slick-Pak is made with too little water it will absorb water from the concrete in order to hydrate. Concrete with superplasticizers tends to have a low water content, so if the Slick-Pak absorbs any water from the plasticized concrete, it will have a tendency to plug. For priming concrete with superplasticizers, we recommend increasing the amount of water used to prepare the priming solution.
Q. If I do not have a bucket available, can I prepare the priming solution in the hopper?
A. Yes. Most operators do it that way. Be sure that the bag dissolves completely by directing the water stream over it.
Q. How long in advance do I need to prepare my priming solution?
A. You need at least 5-10 minutes for the product to dissolve. Once it dissolves, it will stay stable for several hours. So you can prepare your priming solution way before the concrete arrives.
Q. Will Slick-Pak build-up in the pipes and hoses of the pump?
A. No
Q. Can Slick-Pak be added directly into the Ready Mix truck?
A. Yes. It will make the concrete more pumpable.
Q. Does Slick-Pak contain bentonite clay?
A. No. Neither bentonite nor any other type of clay
ConcreteSqueezePumps.Com © 2009