NEW 26m Pump  
Our *NEW* twenty six meter concrete squeeze pump is the most simple pump to use on the market today. It can also pump cellular, aerated, and lightweight concrete mixes at one of the lowest cost per yard in the industry. MSRP $249,500. We are very excited about this new product and know that you will be to.


 
Small Line Pumps  
MAYCO pumps have been the industry standard for over 30 years No small-line ball-valve concrete trailer pump is more trusted or respected today than a MAYCO!


 
Used Boom Pumps  
Concrete Squeeze Pumps has a large array of used Concrete Boom Pumps for sale to facilitate your needs. Be sure to check out our Used Boom Pumps page to see all of the excellent deals on used boom pumps we have to offer.


  Contact Information
Concrete Squeeze Pumps, LLC
11544 Normandy Blvd.
Jacksonville, FL 32221
Toll Free: 888-279-7867
In Florida: 904-378-0007
In NJ: 609-425-6655
Fax: 904-378-8007
 

Slick-Pak 2

(Concrete Primer and Pumping Aid)

USE
Similar in composition to Slick-Pak but with higher amounts of thickening and lubricating agents to help in pumping harsh mixes, lean concrete, lightweight concrete and flowable fill. It can be used as a fluid loss additive when grouting into sandy soils.
ADVANTAGES
  • Increases ease and range of pumpability.
  • Decreases wear on equipment.
  • Decreases horsepower required for pumping.
  • Reduces friction and line pressure.
  • Improves mobility and consolidation.
  • Minimizes slump and air loss through pump lines.
  • Reduces dewatering of concrete.
  • Slick-Pak II is packaged in ready-to-use water soluble Fritz-Pak inner bags for convenient use at the plant or job site.
DESCRIPTION
Slick-Pak II is a dry powdered concrete pumping aid packaged in a patented, ready-to-use, water soluble bag. Slick-Pak II is uniquely formulated to provide the concrete pumper with a cost effective method for improving the pumpability of hard to pump and/or harsh concrete and grout mixes. Additionally, Slick-Pak II reduces line pressure, improves fl ow properties and increases the rate and range of pumpability.
Slick-Pak II does not contain calcium chloride, nitrates, nitrites or other potentially corrosive materials and is compatible with all standard concrete admixtures. In addition, Slick-Pak II contains no bentonite, cementitious materials, soaps, or air entraining agents.
COMPATIBILITY
Slick-Pak II is compatible with all standard concrete materials as well as other concrete admixtures. When used with other admixtures, each one must be dispensed separately into the mix.
Slick-Pak 2 FAQ's:
Q. How does Slick-Pak II work?
A. It contains water thickeners and lubricating agents. As Slick-Pak II goes through the pipes and hoses it leaves a coat of water and lubricating agents and effectively wets all surfaces. As the concrete comes behind the Slick-Pak II it does not lose water and the lubrication allows it to slip through the pipe.
Q. What is the difference between Slick-Pak and Slick-Pak II?
A. Both products have water thickeners and lubricating agents. Slick-Pak has a higher proportion of lubricating agents than Slick-Pak II, thus it is better used as a pump primer. Slick- Pak II has a higher proportion of thickeners, thus it is better suited as a pumping aid, as well as being an excellent pump primer
Q. Does Slick-Pak II have fluid loss properties?
A. Yes. The thickeners used in Slick-Pak II work as fluid loss additives in the concrete.
Q. If I have a long run of hose or pipe, should I increase the Slick-Pak II concentration to make it more effective?
A. No. A too-high concentration may thicken the concrete excessively and produce a plug in the line. It is better to increase the volume of Slick-Pak II used to insure complete coverage and wetting of the line.
Q. What is the best way to prime horizontal lines?
A. Slick-Pak II will tend to run on the lower part of the line, it is recommended to use a rubber ball in front of the priming solution to avoid only wetting the bottom of the line.
Q. Why do I get plugs when priming for concrete with superplasticizers?
A. Slick-Pak II requires water to hydrate, so when Slick-Pak II is made with too little water it will absorb water from the concrete in order to hydrate. Concrete with superplasticizers tends to have a low water content, so if the Slick-Pak II absorbs any water from the plasticized concrete, it will have a tendency to plug. For priming for concrete with superplasticizers, we recommend increasing water content be used to prepare the priming solution.
Q. If I do not have a bucket available, can I prepare the priming solution in the hopper?
A. Yes. Most operators do it that way. Be sure that the bag dissolves completely by directing the water stream over it.
Q. How long in advance do I need to prepare my priming solution?
A. You need at least 5-10 minutes for the product to dissolve. Once it dissolves, it will stay stable for several hours, so you can prepare your priming solution well before the concrete arrives.
Q. Will it build-up in the pump pipes and hoses?
A. No.
Q. Can Slick-Pak II be added directly into the Ready Mix truck?
A. Yes. It will make the concrete more pumpable.
Q. Does Slick-Pak II contain bentonite clay?
A. No. Slick-Pak II does not contain bentonite or any other type of clay.
ConcreteSqueezePumps.Com © 2009